Put the required work beside each quote. Check quantities, attendance and exclusions before you compare totals. Ask about unpriced items before you accept a total.

Get a Quote

Include your bid forms and submission deadline.

Download the arborist quote comparison worksheet (CSV). It has space for three suppliers, their source references and your clarification questions. Add rows from your project's report and drawings.

If you haven't extracted the work yet, start with the arborist report checklist for estimators. ARG can also complete your arborist schedule and quote the work.

Use the same documents for every quote

Record the report, drawings and addenda each supplier priced. A quote against an old fence layout needs confirmation before you compare it with a current one. State whether you need a new report or site work under an existing report.

For each requirement, mark the quote as included, excluded, an allowance or not stated. Record the quantity and price basis alongside that status. “Not stated” doesn't mean included, and an hourly rate doesn't establish how much attendance the total covers.

Check the differences that change the price

Compare each quote with the required work
ItemCompareAsk if unclear
Report and planNew assessment or update, deliverables and included revisions.Does the price include responses to municipal comments?
FencingBarrier detail, length, supply and installation.Are maintenance, approved moves, removal and inspection records included?
Root workLocations, method, equipment, operator and arborist time.Is the supplier performing the work or attending another contractor's work?
AttendanceActivities covered, hours or visits, minimum charge and extra-work rate.Does the allowance cover continuous supervision where specified, or only periodic inspections?
Records and closeoutVisit reports, photos, final visit and required letter.Is later monitoring included? Who supplies any outstanding records?
Price termsTaxes, travel, standby, validity and cancellation terms.Which costs sit outside the stated total?

Ask the site team for the work sequence before comparing attendance allowances. Excavation near several trees on separate days can require several callouts. ARG's construction supervision starts at $145 per hour with a three-hour minimum. The project quote states the allowance and terms. An hourly rate alone isn't a project budget.

A lower total can leave visits unpriced

In this illustrative example, the project requires fencing, attendance during excavation and a final inspection record. These aren't actual customer quotes.

Ask supplier A to price the excavation attendance and final record on the same assumptions as supplier B. Check whether both allowances cover the required activities. Until those answers arrive, keep the missing prices open. Don't add an invented allowance and present it as the supplier's commitment.

Check the forms and qualifications too

A price letter may leave required bid fields unfinished. Check the pricing schedule, technical response, named personnel, relevant experience and supporting documents requested by this tender. Confirm availability for the proposed dates.

Qualification requirements vary by procurement. For example, Burlington's consulting arborist notice specified ISA certification and Tree Risk Assessment Qualification. Don't assume a supplier meets a mandatory condition from its general service description.

If the report names another arborist, check the appointment and permit conditions before accepting a replacement for site work. Agree on who prepares the final records. An arborist's letter doesn't guarantee municipal acceptance or deposit release. Toronto describes its own review in the tree permit process.

Confirm the agreed scope before award

The accepted price should identify the documents, quantities, attendance, records and work by others. Carry unresolved items forward explicitly. If a drawing or site condition changes later, agree on the changed work before it proceeds.

Send ARG the package and the forms you need returned. We complete the arborist portion and quote the reports and site services your project requires.

AI prompt for comparing quotes

Attach the quotes and the underlying project documents you're permitted to share. Comparing quote totals alone won't reveal work every supplier left out. Use this prompt, then check its references.

Compare these arborist quotes against the attached report, drawings, specifications and addenda. Make one row per stated work item. Distinguish permit conditions, specifications and report recommendations. Flag conflicting obligations without choosing which document overrides another. Cite the source file and page or drawing note. For each supplier, cite the quote page and mark the item included, excluded, allowance or not stated. Record quantities, units, attendance minimums and extra-work rates exactly as quoted.

Flag different document revisions, missing work, unequal attendance allowances and equipment assigned to others. Don't treat missing prices as zero or assume an hourly rate includes a stated number of hours. Don't invent a comparable total. Draft a short clarification request for each supplier covering the unresolved differences.

Verify each finding against the original quote and project note. If the tool misreads a table, exclusion or scanned page, correct the worksheet before you send the questions. Keep the suppliers' written answers with the accepted quote.

Send us your tender documents

Email the project address, submission deadline and the full package. Include the bid forms, pricing workbook, drawings, existing report, specifications, permit conditions and addenda. Send attachments or a file-sharing link we can open. Tell us the required return format and expected construction dates.

We'll reply within 24 hours to confirm the next step. We agree on the scope, price and return date after we check the package. Include your estimator's deadline if it's earlier than the tender closing time.

Email your documents

Send to info@arboristgroup.com or call (647) 479-8778. You can also paste a document link and deadline into the form below.

24-Hour Response GuaranteedSubmit below or call (647) 479-8778

Get a quote

Tell us about your property. An ISA Certified Arborist will reply with a firm quote.

  • Free consultation, response within 24 hours.
  • Send the tender forms, document link and deadline. We confirm the arborist deliverables, price and return date.